When your servers hit end-of-life, we move you onto hardware or cloud that's actually supported — with migration planned, tested and verified so nothing is lost and nobody feels it.
THE PROBLEM
Once a server is end-of-life, firmware patches stop, spare parts dry up and compliance frameworks start asking awkward questions. Running EOL hardware isn't cheap — it's a bet. We plan and execute the move before the hardware forces it on you.
R730s, DL380 Gen9s and older — we identify what's past or nearing end-of-life and build your exit roadmap.
Move workloads to Azure, AWS or UK cloud — sized, costed and security-baselined before we touch anything.
From one PowerEdge or ProLiant generation to the next — migrate the data, the services and the config, not the problems.
Every database, mailbox and file store copied and verified with checksums and test restores before switchover.
We stage the migration in parallel and cut over in a maintenance window measured in minutes — not weekends.
The old kit is certified-wiped, recycled or traded in — closing the loop with our disposal service.
HOW IT WORKS
We map every workload, dependency and data store, and flag anything that won't move cleanly.
Refreshed hardware or cloud — sized, priced and security-baselined, with a rollback plan agreed.
Data moved and verified, services rehearsed in staging, then cut over in an agreed window.
Post-migration checks run for a set period, then the old hardware is wiped and disposed of or traded in.
If you need to keep EOL hardware running a while longer, our post-warranty maintenance keeps it covered in the meantime.
Post-Warranty Cover See Replacement HardwareWHY SERVEREXPERTE
Source the replacement from us, migrate with us, then sell the old hardware back — one relationship.
Every migration gets baseline hardening and the same SOC monitoring your other systems enjoy.
Old storage is certified-wiped and disposed of — never left on a forgotten shelf.